Winston-Salem City Code
Cantidad de documentos en esta fuente: 10696
April 25, 2024
Chapters 43—45 Reserved
Chapters 79—81 Reserved
Chapters 83—85 Reserved
Chapters 47—49 Reserved
Sec. 1-2 Definitions and Rules of Construction.
Sec. 1-4 Severability of Parts of Code.
Sec. 1-3 Catchlines, History Notes and References.
Sec. 1-1 Designation and Citation of Code.
Sec. 1-6 Amendments to Code; Effect of New Ordinances; Amendatory Language.
Sec. 1-7 Conflicts With Codes Adopted By Reference.
Sec. 1-5 Repeal, Expiration and Revival of Ordinances.
Sec. 1-8 Delegation of Authority.
Sec. 1-9 Enforcement of Ordinances; General Penalty.
Sec. 10-1 State Building Code Adopted.
Secs. 10-4—10-30 Reserved.
Sec. 10-2 Permits, Inspections and Enforcement.
Sec. 10-3 Penalty.
Sec. 10-32 Late Fee For Failure to Obtain Permit.
Sec. 10-31 Fee Schedule; Determination of Cost of Work; Connection to Public Sewer.
Sec. 10-34 Enforcement.
Sec. 10-33 Street Obstruction Bond For Construction Or Wrecking Operations Near Street Or Sidewalk.
Secs. 10-36—10-60 Reserved.
Sec. 10-35 Burial of Trees, Brush, Stumps, Limbs Or Other Organic Material.
Sec. 10-61 Designation.
Sec. 10-64 Maintenance of Mechanical Systems.
Sec. 10-62 Purpose.
Sec. 10-63 Scope.
Sec. 10-68 Stop Work Orders.
Sec. 10-67 Right of Entry of Inspectors.
Sec. 10-65 Appointment, Compensation and Duties of Inspectors.
Sec. 10-66 Conflict of Interest of Inspectors.
Sec. 10-71 Reserved.
Sec. 10-72 Evidence that Alternate Materials Or Methods Comply With Health and Safety Standards.
Sec. 10-70 Approval of Alternate Materials and Methods of Installation.
Sec. 10-69 Revocation of Permits.
Sec. 10-73 Tests of Alternate Materials Or Methods.
Sec. 10-74 Violations.
Secs. 10-75—10-90 Reserved.
Sec. 10-91 Permit Required; Exceptions; Application.
Sec. 10-94 Payment of Fees Prerequisite to Issuance of Permit; Late Fee For Failure to Obtain Permit.
Sec. 10-92 Drawings and Specifications.
Sec. 10-93 Granting Or Denial of Permit.
Secs. 10-98—10-110 Reserved.
Sec. 10-96 Extra Inspections.
Sec. 10-97 Late Fee For Failure to Obtain Permit.
Sec. 10-95 Fee Schedule; Bond For Payment of Fees.
Sec. 10-112 Inspection Before Concealing Work; Final Inspection; Revocation of Approval.
Secs. 10-113—10-130 Reserved.
Sec. 10-111 Required; Notification that Work Is Ready For Inspection; Additional Inspections.
Sec. 10-132 Correction of Defective Work.
← Previous
1
2
3
4
5
6
7
8
9
…
213
214
Next →
Login
vlex
/