Cantidad de documentos en esta fuente: 10696

April 25, 2024

  • Chapters 43—45 Reserved

  • Chapters 79—81 Reserved

  • Chapters 83—85 Reserved

  • Chapters 47—49 Reserved

  • Sec. 1-2 Definitions and Rules of Construction.

  • Sec. 1-4 Severability of Parts of Code.

  • Sec. 1-3 Catchlines, History Notes and References.

  • Sec. 1-1 Designation and Citation of Code.

  • Sec. 1-6 Amendments to Code; Effect of New Ordinances; Amendatory Language.

  • Sec. 1-7 Conflicts With Codes Adopted By Reference.

  • Sec. 1-5 Repeal, Expiration and Revival of Ordinances.

  • Sec. 1-8 Delegation of Authority.

  • Sec. 1-9 Enforcement of Ordinances; General Penalty.

  • Sec. 10-1 State Building Code Adopted.

  • Secs. 10-4—10-30 Reserved.

  • Sec. 10-2 Permits, Inspections and Enforcement.

  • Sec. 10-3 Penalty.

  • Sec. 10-32 Late Fee For Failure to Obtain Permit.

  • Sec. 10-31 Fee Schedule; Determination of Cost of Work; Connection to Public Sewer.

  • Sec. 10-34 Enforcement.

  • Sec. 10-33 Street Obstruction Bond For Construction Or Wrecking Operations Near Street Or Sidewalk.

  • Secs. 10-36—10-60 Reserved.

  • Sec. 10-35 Burial of Trees, Brush, Stumps, Limbs Or Other Organic Material.

  • Sec. 10-61 Designation.

  • Sec. 10-64 Maintenance of Mechanical Systems.

  • Sec. 10-62 Purpose.

  • Sec. 10-63 Scope.

  • Sec. 10-68 Stop Work Orders.

  • Sec. 10-67 Right of Entry of Inspectors.

  • Sec. 10-65 Appointment, Compensation and Duties of Inspectors.

  • Sec. 10-66 Conflict of Interest of Inspectors.

  • Sec. 10-71 Reserved.

  • Sec. 10-72 Evidence that Alternate Materials Or Methods Comply With Health and Safety Standards.

  • Sec. 10-70 Approval of Alternate Materials and Methods of Installation.

  • Sec. 10-69 Revocation of Permits.

  • Sec. 10-73 Tests of Alternate Materials Or Methods.

  • Sec. 10-74 Violations.

  • Secs. 10-75—10-90 Reserved.

  • Sec. 10-91 Permit Required; Exceptions; Application.

  • Sec. 10-94 Payment of Fees Prerequisite to Issuance of Permit; Late Fee For Failure to Obtain Permit.

  • Sec. 10-92 Drawings and Specifications.

  • Sec. 10-93 Granting Or Denial of Permit.

  • Secs. 10-98—10-110 Reserved.

  • Sec. 10-96 Extra Inspections.

  • Sec. 10-97 Late Fee For Failure to Obtain Permit.

  • Sec. 10-95 Fee Schedule; Bond For Payment of Fees.

  • Sec. 10-112 Inspection Before Concealing Work; Final Inspection; Revocation of Approval.

  • Secs. 10-113—10-130 Reserved.

  • Sec. 10-111 Required; Notification that Work Is Ready For Inspection; Additional Inspections.

  • Sec. 10-132 Correction of Defective Work.